PME

RFQ ID: EP- 102243
Due Date
2023-12-09
Location
UAE
Value
-
Date of Published
2023-11-24
Description
TUBE,EXCHGR,BNDL,STRPR REBOILER,3/4IN
# Item Description Unit Quantity
1 Pipes & Tubes "Basic Data Text: TUBE SPECIFICATION:306 DES SPECIFICATION:ASME SEC VIII DIV 1 MATERIAL SPECIFICATIONN:ASTM A179,1.SCOPE OF WORKFABRICATE TEST AND SUPPLY REPLACEMENT TUBE BUNDLE ASSEMBLY FOR STRIPPER REBOILER TAG NO:17-E-03 ('LIKE TO LIKE' EXACTLY SIMILAR TO THE EXISTING SPECIFICATION/MATERIAL OF CONSTRUCTION) AS INDICATED IN THE DRAWINGS GIVEN BELOW.2.DRAWING & DOCUMENT DETAIS-2.1SNAM DRAWING NO:17-RE-B-23321 2.2SNAM DRAWING NO:17-RE-B-240102.3SNAM SPECIFICATION:17-RA-E-231313.MATERIAL OF CONSTRUCTION ITEM MATERIAL-3.1'U'TUBES:A179-753.2TUBE SHEETS:A105-763.3BAFFLES:A283-75 GR.C3.4SUPPORT PLATE:A283-75 GR.C3.5TIE RODS:A363.6IMPINGMENT PLATE:A283 GR.C3.7SEALING STRIPS:A363.8SPACERS:A179-754.APPLICABLE DESIGN CODES & STANDARDS-4.1ASME VIII DIVISION -1 4.2TEMA-R 4.3API-660 3RD EDITION5.NOTE:-5.1EXCEPT WHERE CHANGES IN MATERIAL OR QA/QC /FABRICATION PROCEDURES (OR ADDITIONAL REQUIREMENTS) ARE SPECIFIED IN THIS PURCHASE REQUEST/ORDER ALL DIMENSIONS,MATERIALS FABRICATION PROCEDURES SHOULD CONFIRM TO THE ATTACHED DRAWINGS AND DOCUMENTS. NO DEVIATIONS ARE ALLOWED5.2ALL MATERAIALS TO CONFORM TO LATEST STANDARDS & CODES5.3NO PARTS WILL BE SUPPLIED BY TAKREER FOR FABRICATION OR TESTS 6.QA/QC REQUIREMENTS (BY TAKREER APPROVED T.P.I.)6.1REVIEW AND ENDORSE THE FOLLOWING:-6.11MILL TEST CERTIFICATES WITH MECHANICAL & CHEMICAL REQUIREMENTS AS PERMATERIAL SPECIFICATION.6.12TUBES EDDY CURRENT TEST REPORT6.13INSPECTION TEST PLAN (I.T.P)6.14WPS WPQ AND PQR AS PER ASME SECT. IX.6.15FABRICATION METHODS TUBE BENDING/TUBE EXPANSIONS PROCEDURES6.16STRESS RELIEVING PROCEDURE OF U-BEND PORTIONS OF TUBES6.2)WITNESS/CARRYOUT THE FOLLOWING-6.21VISUAL EXAMINATION OF MATREIALS.6.22100% ULTRASONIC TEST FOR FLAW DETECTION OF TUBESHEET6.23100% MPI FOR TUBE SHEET6.24TUBESHEET DIMENSIONS CHECKING HOLE MEASUREMENT 6.25D. P. TEST ON ALL WELDS [ROOT &FINAL WELD].6.26CARRY OUT DPT FOR TUBES 'U' BEND AFTER HEAT TREATMENT6.27INSPECT 'U' BEND PORTION DIMENSIONS & HEAT TREATMENT CHART6.28DIMENSIONAL CHECKS DURING ASSEMBLY AND AFTER COMPLETION 6.29TUBE EXPANSION RATIO CALCULATIONS AND ACTUAL EXPANSION CHECKS6.30HYDROTEST-TUBE SIDE 7.DOCUMENTATIONTHE FOLLOWING DOCUMENTS SHOULD BE SUBMITTED ALONG WITH THE DELIVERY OF TUBE BUNDLE7.13-COPIES OF QA /QC DOSSIER INCORPORATING ALL REQUIREMENTS AS IDENTIFIEDIN CLAUSE-6 DULY ENDORSED BY TPI7.23-COPIES OF AS-BUILT FABRICATION DRAWINGS DULY ENDORSED BY TPI7.31-COPY OF TRANSPARANCIES OF AS-BUILT FABRICATION DRAWINGS DULY ENDORSED BY TPI7.41-SOFT COPY OF AS-BUILT FABRICATION DRAWINGS(IN AUTO-CAD)8.BIDDING REQUIREMENTS-VENDOR SHALL CONFIRM IN WRITING COMPLIANCE TO METTULURGY,QA/QC REQUIREMENTS,WARRANTY PAINTING SPECIFICATIONS DELIVERY ETC.DEVIATION AND NON SUBMITTAL OF RELEVENT INFORMATION CAN RESULTIN TECHNICAL REJECTION OF BIDS Classification Text: Class :TUBE,EXCHANGER Characteristics : SIZE :DIA 3/4IN TYPE :BUNDLE,STRIPPER REBOILER WALL THICKNESS:12BWG" EA View
Shipping Terms
Contact Person
View
Contact Number
View
Email
View
Company Location
Abu Dhabi - UAE

Do you want to submit your proposal for this rfq?

Start Chat