TUBE,EXCHGR,BNDL,STRPR REBOILER,3/4IN
# |
Item |
Description |
Unit |
Quantity |
1 |
Pipes & Tubes
|
"Basic Data Text:
TUBE SPECIFICATION:306
DES SPECIFICATION:ASME SEC VIII DIV 1
MATERIAL SPECIFICATIONN:ASTM A179,1.SCOPE OF WORKFABRICATE
TEST AND SUPPLY REPLACEMENT TUBE BUNDLE ASSEMBLY FOR STRIPPER REBOILER
TAG NO:17-E-03 ('LIKE TO LIKE' EXACTLY SIMILAR TO THE EXISTING
SPECIFICATION/MATERIAL OF CONSTRUCTION)
AS INDICATED IN THE DRAWINGS GIVEN BELOW.2.DRAWING & DOCUMENT
DETAIS-2.1SNAM DRAWING NO:17-RE-B-23321 2.2SNAM DRAWING
NO:17-RE-B-240102.3SNAM SPECIFICATION:17-RA-E-231313.MATERIAL OF
CONSTRUCTION ITEM MATERIAL-3.1'U'TUBES:A179-753.2TUBE
SHEETS:A105-763.3BAFFLES:A283-75 GR.C3.4SUPPORT PLATE:A283-75
GR.C3.5TIE RODS:A363.6IMPINGMENT PLATE:A283 GR.C3.7SEALING
STRIPS:A363.8SPACERS:A179-754.APPLICABLE DESIGN CODES &
STANDARDS-4.1ASME VIII DIVISION -1 4.2TEMA-R 4.3API-660 3RD
EDITION5.NOTE:-5.1EXCEPT WHERE CHANGES IN MATERIAL OR QA/QC
/FABRICATION PROCEDURES (OR ADDITIONAL REQUIREMENTS) ARE SPECIFIED IN
THIS PURCHASE REQUEST/ORDER
ALL DIMENSIONS,MATERIALS
FABRICATION PROCEDURES SHOULD CONFIRM TO THE ATTACHED DRAWINGS AND
DOCUMENTS. NO DEVIATIONS ARE ALLOWED5.2ALL MATERAIALS TO CONFORM TO
LATEST STANDARDS & CODES5.3NO PARTS WILL BE SUPPLIED BY TAKREER FOR
FABRICATION OR TESTS 6.QA/QC REQUIREMENTS (BY TAKREER APPROVED
T.P.I.)6.1REVIEW AND ENDORSE THE FOLLOWING:-6.11MILL TEST CERTIFICATES
WITH MECHANICAL & CHEMICAL REQUIREMENTS AS PERMATERIAL
SPECIFICATION.6.12TUBES EDDY CURRENT TEST REPORT6.13INSPECTION TEST
PLAN (I.T.P)6.14WPS
WPQ AND PQR AS PER ASME SECT. IX.6.15FABRICATION METHODS
TUBE BENDING/TUBE EXPANSIONS PROCEDURES6.16STRESS RELIEVING PROCEDURE
OF U-BEND PORTIONS OF TUBES6.2)WITNESS/CARRYOUT THE
FOLLOWING-6.21VISUAL EXAMINATION OF MATREIALS.6.22100% ULTRASONIC TEST
FOR FLAW DETECTION OF TUBESHEET6.23100% MPI FOR TUBE SHEET6.24TUBESHEET
DIMENSIONS CHECKING HOLE MEASUREMENT 6.25D. P. TEST ON ALL WELDS [ROOT
&FINAL WELD].6.26CARRY OUT DPT FOR TUBES 'U' BEND AFTER HEAT
TREATMENT6.27INSPECT 'U' BEND PORTION DIMENSIONS & HEAT TREATMENT
CHART6.28DIMENSIONAL CHECKS DURING ASSEMBLY AND AFTER COMPLETION
6.29TUBE EXPANSION RATIO CALCULATIONS AND ACTUAL EXPANSION
CHECKS6.30HYDROTEST-TUBE SIDE 7.DOCUMENTATIONTHE FOLLOWING DOCUMENTS
SHOULD BE SUBMITTED ALONG WITH THE DELIVERY OF TUBE BUNDLE7.13-COPIES
OF QA /QC DOSSIER INCORPORATING ALL REQUIREMENTS AS IDENTIFIEDIN
CLAUSE-6
DULY ENDORSED BY TPI7.23-COPIES OF AS-BUILT FABRICATION DRAWINGS
DULY ENDORSED BY TPI7.31-COPY OF TRANSPARANCIES OF AS-BUILT FABRICATION
DRAWINGS
DULY ENDORSED BY TPI7.41-SOFT COPY OF AS-BUILT FABRICATION DRAWINGS(IN
AUTO-CAD)8.BIDDING REQUIREMENTS-VENDOR SHALL CONFIRM IN WRITING
COMPLIANCE TO METTULURGY,QA/QC REQUIREMENTS,WARRANTY
PAINTING SPECIFICATIONS
DELIVERY ETC.DEVIATION AND NON SUBMITTAL OF RELEVENT INFORMATION CAN
RESULTIN TECHNICAL REJECTION OF BIDS
Classification Text:
Class :TUBE,EXCHANGER
Characteristics :
SIZE :DIA 3/4IN
TYPE :BUNDLE,STRIPPER REBOILER
WALL THICKNESS:12BWG"
|
EA
|
View
|